Our work

Projects built by Streamline Precision

Built projects from Streamline Precision: dairies, food-processing plants, steel buildings and irrigation pipeline work completed across Idaho and beyond.

Soranco Bean project built by Streamline Precision, Twin Falls, Idaho

Soranco Bean

Twin Falls, Idaho · 2015

Soranco Bean had outgrown its flat bean storage in Twin Falls. Streamline designed and built vertical grain bins with an automated conveyor to load them, engineering the bins, conveyors and concrete pads in-house.

  • Metal grain bins on custom concrete pads
  • Automated conveyor loading system
  • In-house bin, conveyor and foundation design
Funk Dairy project built by Streamline Precision, Twin Falls, Idaho

Funk Dairy

Twin Falls, Idaho · 2014

Streamline built two complete dairies for Funk Dairy: parlors, free-stall barns, sanitation lanes and water-treatment ponds. The earthwork, steel buildings and equipment were all handled in-house.

  • Two complete dairy facilities
  • Parlors, stalls and sanitation lanes
  • Water-treatment ponds
High Desert Milk project built by Streamline Precision, Burley, Idaho

High Desert Milk

Burley, Idaho · 2012

Streamline expanded High Desert Milk's Burley plant with a new 250 by 130 foot steel cooler building, a new processing-plant wing with lab, USDA and mechanical rooms, and a loading dock.

  • 250' x 130' x 40' steel cooler building
  • New plant wing with lab and USDA rooms
  • 84' x 16' loading dock
Packaging Specialties project built by Streamline Precision, Paul, Idaho

Packaging Specialties

Paul, Idaho · 2007–2008

As general contractor for Packaging Specialties' new plant, Streamline handled site prep, steel building erection and underground utilities, and finished ahead of schedule.

  • Site preparation and steel building erection
  • Underground utilities and wastewater drainage
  • Full general contracting oversight
Trinity Frozen Foods project built by Streamline Precision, Pembroke, North Carolina

Trinity Frozen Foods

Pembroke, North Carolina · 2012–2013

Streamline retrofitted an existing Trinity Frozen Foods plant with new and rebuilt process lines, conveyors and slicers for French fry production. The work finished on schedule and on budget.

  • Process line and conveyor retrofit
  • New and refurbished equipment
  • Completed on schedule and on budget
Butte Irrigation project built by Streamline Precision, Oakley, Idaho

Butte Irrigation

Oakley, Idaho · 2009

Butte Irrigation, a Lindsay Zimmatic dealer in Paul, Idaho, hired Streamline for most of the pipe installation on the West Cassia Irrigation Project. The work included bucket-wheel trenching, rock removal and GPS-guided layout for pipe of several sizes. The 40-mile pipeline helps recharge the Snake River Aquifer and supplies water to about 25,000 acres of farmland in Cassia County.

  • 40-mile pipeline serving about 25,000 acres
  • Bucket-wheel trenching and rock extraction
  • GPS guidance system
  • 24", 21", 15" and 12" pipe installation
Bright Harvest project built by Streamline Precision, Clarksville, Arkansas

Bright Harvest

Clarksville, Arkansas

Streamline redesigned the process line for Bright Harvest's sweet potato French fry plant and took over installation to meet a four-month deadline. The job covered line layout, conveyor fabrication, a mezzanine and stainless steel process equipment.

  • Plant line design and CAD drafting
  • Stainless steel process equipment and trench drains, designed and built in-house
  • Conveyor and mezzanine fabrication
  • Refrigeration supervision
  • Full installation supervision, four-month deadline
Sun Valley Potatoes project built by Streamline Precision

Sun Valley Potatoes

Streamline built processing and storage systems from the ground up for Sun Valley Potatoes, the first Idaho potato grower cooperative, which supplies 280 million pounds of potatoes to the fresh market each year.

  • Custom conveyors and storage systems
  • Steel building addition
  • Built from the ground up
Tommy's Express Car Wash project built by Streamline Precision, Burley, Idaho

Tommy's Express Car Wash

Burley, Idaho

Streamline was general contractor for Tommy's Express Car Wash in Burley, from the first blueprint through installation of the wash line for this water-efficient facility.

  • Full design-to-installation contracting
  • Production line installation
  • Water-efficient facility design

Standlee Hay

Burley, Idaho · 2013

Streamline designed and built an automated feed-handling system for Standlee Hay, with custom even-flow storage bins, over 2,000 feet of conveyors, and palletizing and bagging equipment.

  • Six even-flow bins, 50 to 100 feet long
  • Over 2,000 feet of conveyors
  • Metal detector, robotic palletizer, CHIB and Concetti bagging equipment

Amalgamated Sugar

Streamline built and maintains the road system serving Amalgamated Sugar's large-scale sugar beet processing facility.

Have a project like one of these?

Tell us the scope and we will tell you how Streamline would approach it.